OFFICE OF SURVEYOR GENERAL

(Art. of Instructions, No. 38)

ESTIMATE OF THE EXPENSE NECESSARY TO BE INCURRED FOR Preparing Site for

Chinese Hospital-

Supplementary-

REPORT AND ESTIMATE No. 27 OF 1889.

Dated 29 June 1889.


PLAN OR DESCRIPTION.

MATERIALS

PARTICULARS.

LABOUR.

TO BE ISSUED

TO BE PURCHASED

STORES.

MATERIALS

PORTION OF WORK TO BE PERFORMED BY CONTRACT.


The site granted for the New Chinese Hospital is situated immediately behind Possession Point, and will in fact be formed by cutting away a part of what was formerly called Possession Point Hill. The area granted measures 210 feet by 150 feet, a portion of which will have to be cut down to a depth of 50 or 60 feet, while the South and West sides must be sloped to an angle of about 30°. The earth removed will, as far as possible, be used for the Reclamation now going on West of the Harbor Master's Office, but the greater portion will have to be removed in boats to West Point or elsewhere.

The cost of cutting down the Hill, including blasting what stone may be met with, is estimated at $3000, provision for which expenditure will be provided in the Supplementary Estimates.


Earth cutting and removal 287 of Earth to Praya Removal of Earth not required for reclamation, to West Point 965 5709 Blasting Stone 2000 500 300 -- 200 Casualties.... TOTAL 3000

Approved,

(signed) R. G. MacDonnell

LH Moorsom

Surveyor General.

Edit History

2026-05-20 05:42:25 · NVIDIA / meta/llama-4-maverick-17b-128e-instruct
Live
View comparison
AI Proofread
OFFICE OF SURVEYOR GENERAL (Art. of Instructions, No. 38) ESTIMATE OF THE EXPENSE NECESSARY TO BE INCURRED FOR Preparing Site for Chinese Hospital- Supplementary- REPORT AND ESTIMATE No. 27 OF 1889. Dated 29 June 1889. PLAN OR DESCRIPTION. MATERIALS PARTICULARS. LABOUR. TO BE ISSUED TO BE PURCHASED STORES. MATERIALS PORTION OF WORK TO BE PERFORMED BY CONTRACT. The site granted for the New Chinese Hospital is situated immediately behind Possession Point, and will in fact be formed by cutting away a part of what was formerly called Possession Point Hill. The area granted measures 210 feet by 150 feet, a portion of which will have to be cut down to a depth of 50 or 60 feet, while the South and West sides must be sloped to an angle of about 30°. The earth removed will, as far as possible, be used for the Reclamation now going on West of the Harbor Master's Office, but the greater portion will have to be removed in boats to West Point or elsewhere. The cost of cutting down the Hill, including blasting what stone may be met with, is estimated at $3000, provision for which expenditure will be provided in the Supplementary Estimates. Earth cutting and removal 287 of Earth to Praya Removal of Earth not required for reclamation, to West Point 965 5709 Blasting Stone 2000 500 300 -- 200 Casualties.... TOTAL 3000 Approved, (signed) R. G. MacDonnell LH Moorsom Surveyor General.
Baseline (Original)
OFFICE OF SURVEYOR GENERAL P. (Art. of Instructions, No. 38) ESTIMATE OF THE EXPENSE NECESSARY TO BE INCURRED FOR Preparing Site for Chinese Hospital- Supplementary- REPORT AND ESTIMATE No. 27 OF 1889. Darn. 29 June 1889. PLAN OR DESCRIPTION. MATERIALS PARTICULARS. LABOUR. TO BE ISSUE TO BE PROA PURCHASED STORES. MATERIALS PORTION DE WORK TO BE PERFORMED BY CONTRACT. Wa The site granted for the New Chinese Hospital. is situated immediately behind Possession Point, and will in fact, be formed by cutting away a part of what formerly called Possession. Point Hill. The area granked measures 210 fast & 150 feet, a portion of which will have to be cut down to a depth of 50 or 60 fest, while the South and West sides must be sloped, to an of a vouch 30? the earth removed will as far aD possible be used for the Reclamation now, w going. West of the Harbor Master's Offics, but the greater angli 071 portion will have to be removed in Boak to lest Point or elsewhere- The of euthing down the Hill, including Blasting what stor: may be met with is estimated. at $ 3000, provision for which expenditure will be provided in the Supplementary Estimates - Earth cuttin and removal of Earth to Praya Removal of Earth not required. for reel & ton, to West Point - Blasting Stone Approved, (signed) R. G. MacDonnell Jamani.. Casualties.... .. S TOTAL 287 In 9655709 2000 500 300 -- 200 Tora....... 3000 LH Moorsour Scorrevan Genovai.
2026-05-20 05:42:25 · Baseline
View content

OFFICE OF SURVEYOR GENERAL

P.

(Art. of Instructions, No. 38)

ESTIMATE OF THE EXPENSE NECESSARY TO BE INCURRED FOR Preparing Site for

Chinese Hospital-

Supplementary-

REPORT AND ESTIMATE No. 27 OF 1889.

Darn. 29 June

1889.

PLAN OR DESCRIPTION.

MATERIALS

PARTICULARS.

LABOUR.

TO BE

ISSUE

TO BE

PROA

PURCHASED

STORES.

MATERIALS

PORTION

DE WORK TO BE PERFORMED

BY CONTRACT.

Wa

The site granted for the New Chinese Hospital. is situated immediately behind Possession Point, and will in fact, be formed by cutting away a part of what

formerly called Possession. Point Hill. The area granked measures 210 fast & 150 feet, a portion of

which will have to be cut down to a depth of 50 or 60 fest, while the South and West sides must be sloped, to an

of a vouch 30? the earth removed will

as far aD possible be used for the Reclamation now,

w going. West of the Harbor Master's Offics, but the greater

angli

071

portion will have to be removed in Boak to lest Point or elsewhere-

The

of euthing down the Hill, including Blasting what stor: may be met with is estimated. at $ 3000, provision for which expenditure will be provided in the Supplementary Estimates -

Earth cuttin

and removal

of Earth to Praya

Removal

of Earth not required.

for reel & ton, to West Point -

Blasting Stone

Approved,

(signed) R. G. MacDonnell

Jamani..

Casualties....

..

S

TOTAL

287

In 9655709

2000

500

300

--

200

Tora.......

3000

LH Moorsour

Scorrevan Genovai.